
So it's not quite as dramatic as a child, it is still a fun process to watch and witness. Here is a shot with the decking in, timbers in the ground, and the handrailings mostly installed. The next part is the roof.


The ceiling/roof foundation was selected to be a 1x8 heart cypress v-joint paneling, and was installed next, immediately over the rafters. Shown below is a shot of the ceiling before finishing.

Anyway, after the ceiling went it, the shingles (Atlantic White Cedar) were installed, and the roof is awaiting the weathervane, which UPS had better get here soon before I smack someone.
I will post finished shots as soon as I have them.
No comments:
Post a Comment